1
/
of
10
Backyard Haven
Empire Gas Fireplace Boulevard 48" Direct Vent Liner Included EVM48DV
Empire Gas Fireplace Boulevard 48" Direct Vent Liner Included EVM48DV
Regular price
$2,030.82
Regular price
Sale price
$2,030.82
Taxes included.
Quantity
Couldn't load pickup availability
Transform Your Space with the Empire 48" Boulevard Direct Vent Gas Fireplace
Attention Homeowners: Elevate your living space with the Empire 48" Boulevard Direct Vent Linear Gas Fireplace. This stunning fireplace not only adds a touch of elegance but also provides warmth and ambiance to any room.
Benefits
- Saves up to $100 annually on heating costs due to energy-efficient design
- Eliminates the need for a standing pilot, reducing gas consumption by 50%
- Customizable with various liners and decorative trim kits to match your decor
Features
- Includes an electronic intermittent ignition system for reliable operation
- Battery backup ensures remote control functionality even during power outages
- Multi-function remote allows easy switching between modes, including standing pilot for colder climates
Dimensions: 48" x 16.5" x 20"
- Weight: 30 lbs
- Material: Porcelain and metal construction for durability
- Compatibility: Direct vent, compatible with most existing systems
What's Included
- Gas Fireplace
- Barrier Screen
- Ceramic Glass
- Non-Combustible Board
- Matte Black Liner
- Multi-Function Remote Control
- Owner's Manual
Required Accessories
- Crushed Glass - Requires 6 sq. ft. of Clear, Copper, or Bronze on burner (to allow lighting to show). Other colors as accent only.
Optional Accessories
Share
