1
/
of
8
Backyard Haven
Empire Gas Fireplace Boulevard 48" Double-Sided Direct Vent EVM48
Empire Gas Fireplace Boulevard 48" Double-Sided Direct Vent EVM48
Regular price
$3,394.02
Regular price
Sale price
$3,394.02
Taxes included.
Quantity
Couldn't load pickup availability
Transform Your Space with the Empire 48" Boulevard Double-Sided Direct Vent Gas Fireplace
Overview
Create a stunning focal point in your home or commercial space with the Empire 48" Boulevard Double-Sided Direct Vent Gas Fireplace. Perfect for family rooms, hotel lobbies, and upscale restaurants, this fireplace is designed to complement any modern interior.
Benefits
- Saves Energy: Modern electronic intermittent ignition system reduces energy consumption by up to 50% compared to traditional pilot lights.
- Enhances Ambiance: Vibrant flames and adjustable lighting create the perfect atmosphere for any occasion, from cozy evenings at home to grand gatherings.
- Customizable Aesthetics: Choose from elegant reflective black or industrial chic Ridgeback liners, or opt for a rugged Ledgestone or sleek porcelain liner for versatility indoors and outdoors.
Features
- Fully Recessed Burner: Fills the fireplace with vibrant flames, enhancing the overall visual appeal.
- Multi-Function Remote Control: Operate variable burner settings and accent lighting for ultimate convenience and control.
- See-Through Design: Enjoy a clear view of the flames on an interior wall or as an indoor/outdoor see-through on an exterior wall (requires DFED489SS outdoor kit).
Specifications
- Dimensions: 48" x 20.5" x 16"
- Weight: 75 lbs
- Material: Stainless steel and ceramic fiber
- Compatibility: Direct vent installation required; compatible with most existing systems.
Manual
Product documentation and warranty information.
Share
